Get Free Shipping on all US Orders. Order received this week will take 5-7 business days to ship out.
Search

Long Lead

Stock: In stock

$60.00$65.00

Long leads are easy to clean and easy to use. Adding a long lead can enhance your playtime in a big way! Giving a bit more room for your pup to run around and work on commands like “come” and “wait”  Long leads can encourage you to get out to the park without always needing to keep your pup at a tight heal. Quite literally, more room to run, train and play.

Handmade in Seattle, Wa.

Want a custom length or color? Click our “contact us” link at the bottom of the page and send us a message.

Available in 20-foot and 30-foot lengths (while supplies last), these leads are crafted from medical-grade Biothane strapping. Featuring a reinforced nylon core coated with PVC, they are designed for superior durability. Each lead is equipped with a sturdy locking swivel carabiner for secure and reliable use. It doesn’t absorb odors. It doesn’t grow bacteria. It’s ideal for swimming, romping around in wet fall leaves, mud puddles, salty beaches and wet grass. Never have that smelly nylon rope molding from the inside out. Never again wait for your fabric leash to dry in your doorway or in your car. Ever.

Sewn with bar tack stitches to maintain the strength of the strapping. Featuring rounded finished ends, a D-ring for accessories, and contrasting handle colors to quickly identify the end of the lead.

Weight 0.65 lbs
Dimensions 15 × 12 × 3 in
color

Coal, Toast

size

20 Ft., 30 Ft.

Hardware

Auto-Locking Carabiner

We have a number of Home Delivery services available to you. Availability of these options will be shown at checkout.

Delivery Service Description Please Note Price
Standard Within 3-4 working days
(07:00 - 19:30hrs)
Weekdays Only (only applies to orders placed before 6pm) $3.95
Express Delivery Next Working Day (08:00 - 18:00hrs) Weekdays Only, applies to orders placed before 4pm Mon-Thurs, before 3pm on Fri & before 2pm on Sat (no Sunday deliveries) $5.95
Premium Delivery - DPD Next Working Day (07:00 - 19:30hrs) Weekdays Only, applies to orders placed before 4pm Monday-Thursday. (Orders placed after 4pm Thur - Sunday before 1pm, will be delivered Monday) $6.95
Large Parcel Delivery Within 3-5 working days (07:00 - 19:30hrs) Weekdays Only (only applies to orders placed before 6pm) $14.95
Premium Saturday Delivery Saturday Delivery (07:00 - 19:30hrs) Delivered Saturday with a 1 Hour delivery slot and Tracking. (only applies to orders placed on Friday before 2pm) $7.95
Premium Sunday Delivery Sunday Delivery (07:00 - 19:30hrs) Delivered Sunday with a 1 Hour delivery slot and Tracking. (only applies to orders placed on Friday before 2pm) $7.95
Back to Top
Product has been added to your cart